Tutorials
From a new project to an issued revision, and what each calculator asks for and checks.
Set up a project
A project holds its reports, its team and its design basis
1
Start a project
In the app, open Projects and choose New project. Pick the kind of job (office in steel, residential in timber, retaining structure or temporary works) and BuildMetrics suggests a design basis with the source of every value.
2
Confirm the design basis
Check each value before you adopt it: loads, grades, exposure. Calculations bind to these values, so a later change flags every calculation that used them.
3
Bring your team
Copy the team from an earlier project or add people by role: engineer, checker, approver, viewer. Checker, approver and viewer seats are free.
4
Start the reports
Each report starts from a template, with its calculations already wired to the design basis where the units match.
Note: The Design basis tab shows each input by name, with its unit and where it came from.
Open Projects
Calculate and add to a report
Every calculator answers as you type
1
Open a calculator
Choose Calculators, or one of the Quick calculate buttons on Home. The steel beam opens on a worked example: UB 305×165×40 in S275 over 6.00 m at w = 32.9 kN/m, utilisation 0.86.
2
Change the inputs
The result, its status (Adequate, Near limit above 0.90, Fails above 1.00) and the clause each check relies on update as you type.
3
Add it to a report
Press Add to report and choose a draft. The calculation is added and its run recorded with the engine’s fingerprint, the inputs and the result.
Note: Wind loading, section properties, bar schedules and load take-downs inform a design rather than check it, so they show Calculated instead of a pass or fail.
Open Calculators
Build a report in Report Studio
The real A4 page, on your letterhead
1
Follow the next step
The bar under the title always says what to do next (run the calculations, review drafted text, submit) and ⌘ ↵ does it.
2
Add sections
Press / or Add section for a calculation, notes, a design basis or a sign-off. J and K move between sections; R runs the selected calculation.
3
Read Report health
The panel on the right ticks what is already fine and lists what is left, each item a link to its section.
Note: Change an input and the earlier result is marked out of date until you run it again. A report cannot be submitted with an out-of-date result.
Open a project
Check and approve
Independent, and recorded
1
Submit for check
Choose a checker who has not edited the report in this cycle. BuildMetrics suggests the one you used last time on the project.
2
Check it
The checker reproduces each calculation from its stored inputs; the result must match the recorded hash exactly. Findings are raised against sections and answered by the author.
3
Approve
A separate approver approves the checked report. Any edit after a check or an approval voids it.
Note: Anyone who edits a report becomes a contributor to it and cannot check or approve that revision, whatever their role.
Open Review
Issue and export
Locked, hashed, and out as PDF or Word
1
Open the issue sheet
Once a report is approved, Issue… opens the issue sheet: who checked and approved it, PDF or Word, the purpose of issue and the revision note.
2
Send the transmittal
Add the people the project issues to; they are remembered next time and do not need an account. The covering e-mail is written for you to edit.
3
Issue & export
Issuing locks the revision and creates its issue hash. Your chosen format downloads straight away and stays available in Documents.
Note: To change an issued report, start a new revision. The issued one is never edited.
Open Documents
Metric, your copilot
Metric proposes; the engineer decides
1
Pre-check a report
In Report Studio, press Metric. Metric traces the governing calculation from its recorded run, then lists what a checker would ask for, as cards.
2
Accept or dismiss
Nothing changes until you accept a card. Accepted text arrives marked not reviewed and blocks submission until someone has read it.
3
Ask anything
⌘ K searches and runs commands; type a question to ask Metric about your work. ⌘ J asks straight away.
Note: Metric never writes a calculation input or result, and never submits, checks, approves or issues.
Open BuildMetrics
Drive mode
Change a report by voice
1
Choose the report before you set off
Open Drive mode, pick a draft, put the phone in a cradle.
2
Say what to change
For example, “make beam B1 six and a half metres and rerun it”. Metric reads the change back and waits for your “yes”, then runs the engine and tells you the result, including a fail.
3
Ask for a link
“E-mail me the report” sends a link to the draft, marked not yet checked.
Note: Use Drive mode hands-free only, and only where it is safe and legal to do so.
Open Drive mode
Steel
EN 1993-1-1 and 1-8 with your project’s National Annex
1
Steel beam
Choose a universal beam, grade, span, restraint and the characteristic loads Gk and Qk. It checks bending (§6.2.5), shear (§6.2.6) and deflection under imposed load (UK NA 2.23). If the compression flange is not fully restrained, it also checks lateral-torsional buckling (§6.3.2.3) over the unrestrained length with your C1.
2
Steel column
Axial load, effective length factor and section properties; checks flexural buckling resistance.
3
Steel member
Combined axial force, bending and shear on a UB or UC.
4
Bolted connection
Shear on a bolt group by bolt grade, diameter and number (BS EN 1993-1-8 Table 3.4).
Concrete
EN 1992-1-1 with your project’s National Annex
1
RC beam
Flexural reinforcement (K and lever arm), concrete shear resistance, minimum reinforcement and span/depth deflection.
2
RC column
Axial resistance and a linear N + M interaction, with the reinforcement limits.
3
RC slab
Moments and reinforcement for a slab panel under its ultimate load.
4
BS 8666 schedule
Bar lengths and masses for a bar bending schedule.
Timber, geotechnical, loads
BS EN 1995, 1997 and 1991
1
Timber column
Compression with the instability factor kc and combined compression and bending.
2
Pad footing and retaining wall
Bearing, bending and punching for a pad; earth pressure, sliding, overturning and bearing for a cantilever wall.
3
Wind loading and load take-down
Peak velocity pressure qp from the basic wind velocity, terrain and altitude; floor-by-floor axial load.
4
Site hoarding
Posts, rails, sheeting and foundations for a temporary hoarding, after TWf2012:01.